* merge geth v1.10.15
* fix: Removed FastSync from cli server
* fix: TestHeadersRLPStorage
* Added t.skip(ETH2 in bor)
* fix: flow in create consensus engine
* bumped version
* Fix typo
* increase block time
* remove file
* bumped version
* merge gethv1.10.17
* bumped version
* fix failing tests
* Bump Go version to v1.18 (#368)
* Bump Go version to v1.18.1
* Build using netgo tag
This will create a static build using Go native networking stack.
Checked and it works stable for all archs and distros.
* Fix meta
* Bump version
* Meta as stable
Co-authored-by: Shivam Sharma <shivam691999@gmail.com>
Co-authored-by: Manav Darji <manavdarji.india@gmail.com>
Co-authored-by: Sandeep Sreenath <sandeep.sreenath@gmail.com>
Co-authored-by: Victor Castell <victor@victorcastell.com>
The main idea behind it is: the range compaction is very expensive
which can take a few hours to finish. During this long procedure,
a lot of exceptions can occur, e.g.
- Geth is killed manually
- Geth is killed because of machine crash
- etc
In order to minimize the effect of the exceptions, the compaction
is moved out of the pruning. So that even the compaction is not
finished, the pruning is regarded as done.